Sonic Drilling, job completed

Discussion created by tina@mallard-inc.com on Aug 31, 2016

We have completed field work of soil borings, monitoring well installation.   

This job was scheduled for 15 days.

20 soil borings,  to between 70'-100', 3 monitoring wells to 70', completed in 8 days.

 

The photos:

1 is of monitoring well being developed. 

2nd is monitoring well pad, manhole, drum.

 

With this site being soil, all development water must be drummed.